Consulting Service: we provide one-on-one support to any of your problems, providing the most efficient technical solutions in time.
Technical Support: we will develop a full set of installation drawings and equipment flow charts based on detailed discussions with our clients. We have professional technicians who will be involved in the establishment of your company's technical solutions.
Spare Parts Supply
| Daily use precautions: the normal supply of power, water, gas, temperature conditions required by the machine and the normal opening and closing; voltage regulator can be installed when necessary to reduce damage to the controller, solenoid valve caused the power supply problems to improve the power supply stability Shutdown and unpressurization maintenance The air compressor should be maintained regularly, and the air filter, oil filter and oil should be replaced regularly according to the instructions. Check whether the cold dryer is under refrigeration every day, replace the filter element every six months, and remove oil and water in time. Check whether the drain at the lower end of the filter is drained automatically every week. Manually drain the drain at the lower end of the air buffer tank every day. Keep the nitrogen generator in a clean, dry and ventilated working environment. |
Nitrogen Generator Maintenance Process: Daily Inspection
Routine Inspection
|